Source Step 20 - Work Order: Materials tab (added items)

FS v2 mobile design reference - supporting browser screenshot and extracted notes

Top Level
Source step 20 screenshot Click image to enlarge

20 — Work Order: Materials tab (added items)

Description

MATERIALS tab after pulling lines in from Estimates (Add from Estimates). Shows the single HVAC Control System as planned material.

Toolbar

Add Items, Add from Estimates (highlighted), Free Check, Actions. Filter: Planned Items.

Row

  • *Branch: PRODWHOLE
  • *Inventory ID: CSYSTEM01
  • Description: HVAC Control System
  • Status: Ready for Dispatch
  • Warehouse: WHOLESALE
  • *UOM: EA
  • Required Qty: 1.00
  • Unit Cost: 17,500.00
  • Est. Cost: 17,500.00
  • Processing Source: PO
  • Qty. to Order or Allocate: 0.00
  • Qty. on Orders: 0.00
  • Qty. Awaiting Delivery: 0.00