Source Step 21 - Work Order: Materials tab (scrolled right)

FS v2 mobile design reference - supporting browser screenshot and extracted notes

Top Level
Source step 21 screenshot Click image to enlarge

21 — Work Order: Materials tab (scrolled right)

Description

Same Materials row as screen 20 but scrolled right to reveal additional planning and scheduling columns. Demonstrates the breadth of material-tracking info available on the Work Order.

Visible columns (right-hand)

  • WHOLESALE
  • EA
  • 0.00
  • 17,500.00
  • 0.00 (Vendor)
  • Processing Doc. Ref. Nbr.
  • Qty. to Order or Allocate
  • Qty. on Orders
  • Qty. Required (Minimum)
  • Qty. Awaiting Delivery
  • Qty. Available for Dispatch
  • Qty. Required
  • Qty. In Transit
  • Qty. Dispatched
  • Planned Start Date: 4/10/2026
  • Planned End Date: 4/10/2026
  • Status: Ready for Dispatch