Source Step 25 - Calendar Board: Work Event scheduled

FS v2 mobile design reference - supporting browser screenshot and extracted notes

Top Level
Source step 25 screenshot Click image to enlarge

25 — Calendar Board: Work Event scheduled

Description

Two HVAC Maintenance Work Events have been dropped onto the calendar — one on Layla Beauvoir and a longer one on Maxwell Baker spanning the day. Dragging an unscheduled WO creates a Work Event against the technician. The left panel lists the other unscheduled orders still pending.

Left panel (summarised)

Multiple WO cards visible with addresses, Maintenance Work / HVAC Installation labels. Filter pill: WO-000046.

Right panel — scheduled bars

  • Layla Beauvoir: blue bar labeled WO / Maintenance (short, AM block)
  • Maxwell Baker: wide blue bar labeled WO / Maintenance (full morning into afternoon)
  • Todd Bloom, Florida Electrical, Martin Benns, Parker & Sons HVAC: empty rows